Handover of Decentralized Wastewater Treatment System in Viem Xa, Bac Ninh

Created on 13 November 2013 Print Email

Along with the completion of the separate collection pipelines of 5 project alleys in Viem Xa village in July 2013, the decentralized wastewater treatment demonstration system, initiated, planned, designed and constructed with substantial support from WMP, has basically been finalized.

For the operation and maintenance of the system, WMP took ​​regular samples and conducted periodic surveys in Viem Xa treatment plant until the end of August 2013. Since September 2013, the sampling as well as monitoring of the operation and maintenance of Viem Xa treatment plant have been performed and reported monthly by the Wastewater Division.

On November 8, 2013, the WMP Component 3 officiallz transferred the O&M, preformance monitoring and supersvision of the entire system to Bac Ninh Water Supply and Sewerage One-member Limited Company. The company will continue to carry out sampling and analysis activities to optimize treatmentefficiency and minimize energy consumption of the plant.

Subscribe To Our Newsletter

Enter your name and email address to start receiving our newsletter.